110kV变电站母线穿墙施工方法及工艺研究 预览 被引量:3

Through-wall Construction Methods and Technique of Bus-bars in 110kV Substations
在线阅读 下载PDF
收藏 分享 导出
摘要 介绍了110 kV变电站母线穿墙时的两种施工方法,一是穿墙套管安装方式,二是安装穿墙隔板的方式,分析了两种施工方法的工艺过程以及穿墙套管安装方式中的混凝土穿墙板和金属穿墙板的施工工艺细节,并就两种不同安装方法进行了比较。结果表明,在母线和穿墙套管连接处使用的线夹中,SY-□/B型线夹比其他两种型号的线夹好。该安装工艺可避免发生因穿墙施工质量问题及母线穿墙接地而发生的事故。 Two construction methods,wall bushing and through-wall partition board,for through-wall of bus-bars in 110 kV substations were stated and the processes were analyzed.The construction procedure and details of wall bushing method that applies concrete and metal through-wall board were respectively illustrated.Comparison of the two construction ways shows that the cable cleat type SY-□/B used in joining bus-bar and wall bushing has a better quality.The construction technique can avoid accidents due to bad thro...
作者 唐攀龙 周羽生 马士英 邝江华 邹蓓琳 TANG Pan-long1; ZHOU Yu-sheng1; MA Shi-ying1; KUANG Jiang-hua1; ZOU Bei-lin2(1.School of Electric & Information Engineering; Changsha Universityof Science & Technology; Changsha 410076; China; 2.110kV Substation; Hunan Ouyanghai Hydropower Plant; Hengyang 421101; China);
出处 《绝缘材料》 CAS 北大核心 2009年第1期,共4页 Insulating Materials
关键词 110KV变电站 穿墙套管 穿墙隔板 线夹 110 kV substation wall bushing through-wall partition board cable cleat
  • 相关文献

参考文献6

二级参考文献7

共引文献86

同被引文献20

引证文献3

二级引证文献1

投稿分析

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部 意见反馈
新型冠状病毒肺炎防控与诊疗专栏