麒麟观拱坝溢洪道悬挑部位预制模板的设计与施工 预览 被引量:3

Design & Construction of prefabricated form for spillway overhanging crest of Qilinguan Arch Dam
在线阅读 下载PDF
收藏 分享 导出
摘要 五峰麒麟观水电站碾压混凝土双曲拱坝溢流坝顶悬挑部位施工时采用钢筋混凝土预制模板,模板用内拉钢筋固定,因而节约了材料,缩短了工期,降低了工程成本。对模板设计详情加以介绍。 Qilinguan double-curved arch dam is situated at Wufeng County,Hubei Province.It s made of RCC.The prefabricated reinforced-concrete forms are used for the construction of the overhanging crest of the overflow dam section.The forms are fixed by interactive tension bars.Therefore,the materials consumption is saved,the engineering cost is cut down and the construction period is shortened.The design details of the prefabricated forms are described.
作者 胡清玲 韩锋 HU Qingling; HAN Feng(College of Civil & Hydropower Engineering; Three Gorges University; Yichang 443002; China);
出处 《湖北水力发电》 2009年第1期,共3页 Hubei Water Power
关键词 双曲拱坝 溢流坝段悬挑部位 预制模板 设计 double-curved arch dam overflow dam section overhanging crest prefabricated forms design
  • 相关文献

同被引文献9

引证文献3

投稿分析
职称考试

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部 意见反馈