软岩嵌岩长桩嵌土段工作机理研究 预览 被引量:5

Study on Mechanism of the Length in Strata of Long Piles Socketed in Soft Rock
在线阅读 下载PDF
分享 导出
摘要 通过系统的数值模拟,对软岩嵌岩长桩嵌土段的工作机理进行了分析,认为嵌岩使得桩周土体中附加应力分布集中;同时,相对于具体工程条件,桩的嵌岩深度存在一最优值. By means of systematic numerical simulation, the mechanism of the length in strata of long piles socketed in soft rock are studied and it is thought that the stress of the strata around piles tends to concentrate near the piles, and a prime length of the pile socketed in rock exists in a concrete project.
作者 姚海波 陈征宙 王梦恕 皇甫明 YAO Hai-bo~1,CHEN Zheng-zhou~2,WANG Meng-shu~1,HUANG FU-Ming~1(1.School of Civil Engineering and Architecture, Beijing Jiaotong University, Beijing 100044,China;2.Earth Science Department, Nanjing University, Nanjing 210093, China)
出处 《北方交通大学学报》 CSCD 北大核心 2004年第4期 37-40,67,共5页 Journal of Northern Jiaotong University
关键词 土木建筑结构 数值模拟 嵌岩长桩 嵌土段 architecture structure of civil engineering numerical simulation long pile socketed in soft rock pile length in strata
  • 相关文献

参考文献10

二级参考文献34

共引文献204

同被引文献40

引证文献5

二级引证文献12

投稿分析

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部 意见反馈