济南奥体中心体育场钢结构支撑卸载全过程模拟 预览 被引量:13

Whole removal process of Jinan simulation of temporary support Olympic Stadium
在线阅读 下载PDF
收藏 分享 导出
摘要 济南奥体中心体育场钢结构罩棚采用折板型空间悬挑桁架结构体系.通过全过程施工模拟分析,控制结构在施工卸载后结构自重与永久附加恒、活、风荷载、地震作用、温度作用最不利组合下的构件应力.通过多方案计算对比制定可行的卸载方案,给出卸载量程等一些动态的量化指标,分阶段提供钢结构卸载验收指标,指导实际施工. The cantilever spatial folded plate truss is adopted as steel roof of Jinan Olympic Studium. By the simulation of the whole removal process, the stress of elements is controlled under different load cases such as dead load, live load, wind load, seismic load and temperature. The reliable removal scheme is chosen by multi scheme analysis and dynamic index during removal process is provided to guide the actual construction.
作者 高颖 傅学怡 杨想兵 GAO Ying, FU Xue-yi, YANG Xiang-bing ( China Construction (Shenzhen) Design International, Beijing 100013, China)
出处 《空间结构》 CSCD 北大核心 2009年第1期 20-26,34,共8页 Spatial Structures
关键词 体育场 钢结构安装 支撑卸载 施工模拟 stadium installation of steel structure removal of temporary support construction simulation
作者简介 高颖(1981-).女.浙江宁波人,硕士,工程师,主要从事大跨度空间结构的设计和研究 通讯联系人:傅学怡。男,研究员.E-mail:fu_xue_yi@yahoo.com.
  • 相关文献

参考文献3

  • 1中建国际设计深圳顾问有限公司.国家游泳中心施工全过程分析报告[R],2005. 被引量:1
  • 2中建国际设计深圳顾问有限公司.济南奥体中心体育场施工全过程分析报告[R],2007. 被引量:2
  • 3傅学怡,杨想兵,高颖.济南奥体中心体育场悬挑罩棚结构设计[A].第七届全国现代结构工程学术会议论文集[C],2007:65-74. 被引量:2