摘要 龙开口水电站工程枢纽区地震基本烈度为Ⅷ度,基岩场地设计水平峰值加速度为0.394g,大坝抗震分析和抗震措施设计是工程关键技术问题之一。采用数值计算方法和模型试验,对碾压混凝土大坝进行了全面的动力分析,并根据研究成果进行了有针对性的抗震设计。 The basic earthquake intensity of area where the hydraulic structures of Longkaikou Hydropower station located is 8 degree, and the peak value of horizontal acceleration in rock base area is 0.394 g. The seismic analysis and design is a key engineering problem for Longkaikou project. A comprehensive dynamic analysis is conducted for the RCC dam by numerical methods and model tests, and the specific seismic design is carried out according to these researches. earthquake resistance; design; measures; Longkaikou Hydropower Station
作者 高雅芬 叶建群 刘西军 陈国良 GAO Yafen, YE Jianqun, LIU Xijun, CHEN Guoliang (HydroChina Huadong Engineering Corporation, Hangzhou 310014, Zhejiang, China)
出处 《水力发电》 北大核心 2013年第2期47-49,89共4页 Water Power
关键词 抗震 设计 措施 龙开口水电站 earthquake resistance design measures Longkaikou Hydropower Station
作者简介 高雅芬(1982-),女,湖北天门人,高级工程师,主要从事水工结构设计工作.
  • 相关文献

参考文献3

  • 1叶建群;熊立刚;陈国良.云南金沙江龙开口水电站防震抗震设计研究专题报告[R]杭州:中国水电顾问集团华东勘测设计研究院,2008. 被引量:1
  • 2李德玉;欧阳金惠;涂劲.重力坝动力分析及抗震安全评价研究[R]北京:中国水利水电科学研究院,2009. 被引量:1
  • 3周晶.碾压混凝土重力坝动力模型试验[D]大连:大连理工大学,2007. 被引量:1

同被引文献7

引证文献3

投稿分析

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部 意见反馈