300MW汽轮机光轴供热改造及启动运行方式的研究

Study of 300MW Steam Turbine Shaft Heating Reform and Start Operation Mode
收藏 分享 导出
摘要 介绍了300MW机组光轴改造的重要项目以及主辅机启动运行方式的变化。主机改造主要是更换掉中低压缸联络管上原有的关断蝶阀,使低压缸不进汽。主蒸汽由高压主汽门、高压调节汽门进入高中压缸做功,中压排汽通过新增的管路全部进入新增的热网加热器供热。同时详述了改造后机组安全可靠的启动运行方式以及相关的注意事项。介绍了机组通过此改造所能实现的预期经济效益,并对机组的改造及改造后运行的进一步优化提出了建议和意见。 The plain shaft transformation of important items of 300 MW unit and main auxiliaries of the change of operation mode is introduced. Host transformation mainly is the low pressure cylinder contact pipe to replace the original turn off butterfly, keep low pressure cylinder from admission. Lord is composed of high pressure main steam valve, high pressure regulating valve into the work of high pressure cylinder, medium pressure steam discharge line all through the new heater heating the new network. Give details of the unit at the same time start the operation mode of the safe and reliable and relevant considerations. Unit are introduced by this transformation can achieve the desired effect, and after the renovation and transformation of the unit operation of further optimization proposals and suggestions are put forward.
作者 吕蒙 周斌 宁罡 LV Meng;ZHOU Bin;NING Gang
出处 《电站系统工程》 2018年第6期41-44,48共5页 Power System Engineering
关键词 300MW汽轮机 光轴 供热 节能改造 300MW steam turbine plain shaft heating energy-saving renovation
作者简介 吕蒙(1986-),男,工程师。陕西西安,710065.
  • 相关文献

参考文献8

二级参考文献41

共引文献41

投稿分析

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部 意见反馈