期刊文献+

建筑应用隔震技术的施工工期计量与计价分析 预览

Analysis of Construction Period Measurement and Valuation of Building Application Isolation Technology
在线阅读 下载PDF
收藏 分享 导出
摘要 目前我国隔震建筑处于推广应用阶段,为了协调工程实践中参建各方因隔震建筑施工工期计量计价不合理所引起的利益纠纷,对多栋已建隔震建筑进行调研,结合隔震建筑施工工艺流程特点和目前隔震工程施工管理实际情况,详细分析了影响隔震建筑施工工期的主要因素,包括:隔震层施工工艺特点;参建各方缺乏管理经验;参建各方计量计价纠纷。在此基础上,结合人工定额编制原理,提出隔震建筑工期计量计价的思路和方案,供定额编制人员和参建各方参考。 At present the isolation and construction of isolated buildings in China is in the stage of popularization and application. In order to coordinate the interests and disputes caused by the irrational price of the construction period in the construction of the isolated buildings,research on the isolated buildings in Fujian Province is carried out. The characteristics of the construction process of the isolated building and the actual situation of the construction management of the isolated works are analyzed in detail. The main factors influencing the construction period of the isolated building are analyzed as follows: the construction technology of the isolation layer is different from the construction experience. Based on this,combined with the principle of artificial quota compilation,this paper proposed the construction of the seismic construction of the pricing of ideas and programs for the establishment of quotas and participants reference.
作者 张嘉 ZHANG Jia ( The First Construction Comapy of Xiamen Tong'an Region, Xiarnen, Fujian 361100, China)
出处 《水利与建筑工程学报》 2017年第3期198-202,共5页 Journal of Water Resources Architectural Engineering
基金 厦门市建设与管理局科技项目(厦建科[2014]21号)
关键词 隔震建筑 施工工艺 施工工期 计量计价 时间定额 isolation building construction technology construction period metering and pricing time quota
作者简介 张嘉(1984-),女,陕西岐山人,工程师,主要从事建筑工程管理工作。E-mail:18131838@qq.com
  • 相关文献

参考文献4

二级参考文献13

共引文献7

投稿分析

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部 意见反馈