浅谈一种组合式围堰施工方案 预览 被引量:1

Discussion on a Construction Scheme of Combined Cofferdam
在线阅读 下载PDF
收藏 分享 导出
摘要 某桥梁1#墩深埋承台施工采用下部钢筋混凝土+上部钢板桩的组合式围堰结构施工方案,既解决了常规围堰施工方法工期长、成本大的问题和钢筋混凝土井壁后期拆除困难的难题,也考虑了成桥后墩位处通航疏浚的需求。其施工方案的成功应用为同类型深埋基础的施工积累了宝贵经验。 The construction scheme of combined cofferdam structure of lower reinforced concrete and upper steel sheet pile is adopted in the construction of deep-buried bearing platform of pier 1 of a bridge, which not only solves the problems of long construction period,high cost and difficult removal of reinforced concrete shaft lining in later stage of the conventional cofferdam construction method, but also considers the requirement of navigation dredging at pier position after completion of the bridge. The successful application of the construction scheme has accumulated valuable experience for the construction of deep foundation of the same type.
作者 詹彪 ZHAN Biao(China Railway Major Bridge Group First Engineering Co., Ltd., Zhengzhou 450000, China, Anhui Zhuoliang New Materials Co., Ltd., Hefei 230000, China )
出处 《价值工程》 2018年第20期158-160,共3页 Value Engineering
关键词 钢筋混凝土 钢板桩 组合式围堰 reinforced concrete steel sheet pile combined cofferdam
作者简介 詹彪(1983-),男,四川遂宁人,毕业于重庆交通大学,研究方向为桥梁工程。
  • 相关文献

二级参考文献5

共引文献2

同被引文献3

引证文献1

投稿分析

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部 意见反馈