摘要 针对某300MW供热机组的汽轮机特性以及其所在热电厂的供热背景,分析了高背压改造存在的关键技术问题,提出了汽轮机本体及主要辅机的改造方案,并通过改造后的热力性能试验分析了高背压改造对机组性能的影响。分析得出,所采用的改造方案是可行性的,改造后机组节能降耗效果显著。机组供电煤耗由改造前的289. 48g/(k W·h)降至151. 04g/(k W·h),降低了47. 82%。 In this paper,according to the characteristics of the steam turbine of a 300 MW heating unit and the heating background of the thermal power plant where it is located,the key technical problems in the high-pressure reformation are analyzed,and the transformation plan of the turbine body and the main auxiliary equipment is proposed,and the heat energy after the transformation is proposed. The performance test analyzes the effect of high back pressure reformation on unit performance. The analysis shows that the reconstruction scheme adopted in this paper is feasible,and the energy saving and consumption reduction effect of the unit after transformation is significant. The net coal consumption of the unit reduced from 289. 48 g/( k W·h) before the transformation to 151. 04 g/( k W·h),a decrease of 47. 82%.
作者 王力 陈永辉 李波 陈晓利 孔德奇 王云龙 高继录 祝海义 WANG Li1,CHEN Yong-hui2,LIU Bo3,CHEN Xiao-li2,KONG De-qi1,WANG Yun-long3,GAO JI-lu2,ZHU Hai-Yi4(1 SPIC Northeast Electric Power Company Limited,Shenyang 110181, China; 2 CPI Northeast Energy SavingTechnology Company Limited,Shenyang 110179, China;3 SPIC Fushun Thermoelectric Parent ̄Company,Fushun 113000, China; 4 Harbin Turbine Company Limited,Harbin 150046, China)
出处 《汽轮机技术》 北大核心 2018年第5期385-388,共4页 Turbine Technology
基金 国家电力投资集团公司科技项目(2018-009-KJ-DBGS)
关键词 300MW供热机组 高背压 汽轮机 改造方案 供电煤耗 300MW heating unit high back pressure steam turbine reconstruction scheme net coal consumption
作者简介 王力(1967-),男,辽宁盘锦人,高级工程师,工学硕士,主要从事火力电节能及环保技术研究.