摘要 为研究富水地层双线小净距土压平衡盾构隧道开挖面的扰动行为和稳定性,基于屈服接近度的概念.提出开挖面稳定性分析方法;并结合广佛环线沙堤隧道工程,分析不同纵向开挖间距下双线隧道施工时,先行隧道开挖面的掺流场分布、应力场扰动和极限支护压力差异性。研究结果表明,随着纵向开挖间距的增大,先行隧道开挖面的水压力分布趋向于以隧道中心为轴线呈近似对称分布,后行隧道开挖引起的先行隧道开挖面的渗透力较小:屈服接近度可以从应力扰动的角度反应隧道施工对于土体的扰动程度和开挖面稳定性的影响;对于富水地层双线小净距土压平衡盾构隧道,不同纵向开挖间距下先行隧道开挖面的极限支护压力差别不大。 In order to study the disturbance behavior and stability of the excavation face of small interval double-line earth pressure balance shieht tunnel in water-rich composite stratum, a stability analysis method for excavation taee is put forward based on the concept of yield approaching degree, and with ret)renee to the Shadi shield tunnel on Guangzhou-Foshan ring railway, the seepage pressure distribution, the disturbance of stress field and the difference of ultimate support pressure at the excavation face of the former tunnel under dift)rent longitudinal excavation spacing are analyzed. The results indicate that with the increase of the longitudinal spacing, the distribution of the water pressure at the excavation face tends to be approximately symmetrical along the axis of the tunnel, and the seepage three at the excavation face of the former tunnel caused by the excavation of the later tunnel is smaller. The disturbance degree and stability of the excavation face can be reflected by yield approach index from the angle of stress disturbance. For small interval double-line earth pressure balance shield tunnel in water-rich stratum, there is little difference in the ultimate supporting pressure of former tunnel excavation face under differenI longitudinal excavation spacing.
作者 王闯 封坤 戴志成 吴文彪 林辉 陈怀伟 WANG Chuang1, FENG Kun1, DAI Zhi-eheng1, WU Wen-biao2, LIN Hui2, CHEN Huai-wei3 (1. Key Laboratory of Transportation Tunnel Engineering, MinistlT of Education, Southwest Jiao Tong University, Chengdu 610031, China; 2. YSD Rail Transit Construction Co. , Ltd. , Guangzhou 510610, China; 3. Zhejiang Institute of Mechanical & Electrical Engineering Co. , Ltd. , Hangzhou 310051, China)
出处 《铁道标准设计》 北大核心 2018年第12期112-117,124共7页 Railway Standard Design
基金 国家重点研发计划(2016YFC0802202) 国家自然科学基金(51578462)
关键词 富水地层 流固耦合分析 双线土压平衡盾构隧道 开挖面稳定性 屈服接近度 Water-rich stratum Fluid-solid coupling analysis Double-line earth pressure balance shield tunnel Stability of excavation face Yieht approach index
作者简介 王闯(1993-),男,硕士研究生,主要从事盾构隧道技术方面的工作,E-mail:chwang08@163.com。;通信作者:封坤(1983-),男,副教授,博士,主要从事隧道与地下工程方面的研究和教学工作,E-mail:windfeng813@163.com。